All Kinds of Structure Joint-points Photos

 

Installation technology of horizontal fram

 

(1)Installation method from up to down
(2)Installation method from left to right



 

Installation technology of vertical frame

Installation technology of vertical frame

(3)Installation method for 4:1
 (4)Installation method for 2:1






(5)New-type installation of welding and anchoring-fixing

 





(6)New-type installation of screw and anchor






(7)New and old type installation?of long screw welding 

 

(8)New and old type installation?of screw-angle steel composition

 


(9)Old type installation of anchoring and welding

 

 

 

Three new type installation of cylindrical surface

 



A type


B type


(A1)This kind of technique can drill a groove on the back of stone board freely


(B1)This kind of technique can drill a groove on the side of stone board freely(internal wall).



 


 
(A2)
(B2)

 

 


(A3)

 

 


(B3)

 

(B4)、Old Installation Technique: The shockproof performance is poor; it is easy to fall off after bending, thermal expansion and cold shrinkage.

 

 

C、Installation technology in the back  

(C4)


Shenyang Jiamei New Stone Art and Decoration Limited Company
Add.: The 2 nd door No.3 ,28Jia North Street. Of Qixian ,Tiexi District Shenyang City ,Liaoning province ,CHINA
postalcode:110025
Office Tel.:+86-24-25604422/25604411 Mobile:+86-13322443766/13700009698 BeiJing Tel:010-81505546